My first job site was back at the Longhorn Stake
House next to the Fiesta Mall. I arrived on site for a footing inspection, and
utilities trench backfill density tests. The footing inspection consist of
probing all of the footing bottoms and making sure they are in firm approved
fill, and there are no lose soils. While I was probing I did find a problem
area that was probing soft. My probe was sinking down about a foot and a half
down. I had to talk to both the grading contractor and the superintendent on how
to resolve the issue. We all agreed that the contractor would remove the loose
soil until the bottom of footing is into firm/hard soils. The contractor excavated down to firm soils
while I tested one foot of utilities trench backfill. The trench backfill met
the minimum percent compaction. After I verified the newly excavated footing
bottom, I documented what happen and how it was resolved in my notes on my
field notice paperwork. The footing situation was good experience for me on how
to resolve a conflict on a job site