My morning started off with a site meeting at the Fiesta
mall where a proposed Longhorn Stake House is going to be built. I met with the
grading contractor and the superintendent to go over the soils report. The site
was previously compacted and consisted of approved engineered fill, so no
excavation was needed for the building slab. The only thing that was required
by the engineer was to observe and verify
one foot of scarification and compaction for the building pad. The top
foot of the pad was ripped and water was added to the soil. The soil was then
compacted. I took four density test for on the building pad. Probing and
density test confirmed that the soil met a minimum 95% compaction. After I finished up my paper work I was off to
two other jobs to pick up concrete samples. One of those jobs is the City Scape
apartments that are in downtown Phoenix. I’m sure you have seen the
construction going on your way to ASU.