The next day I returned to the Buckeye self storage job
site. When I pulled in to gate I noticed that the contractor had six building
pads excavated to three feet below the bottom of footings. The bottom soils
were excavated into natural soils per the soils report. I approved the bottoms
of the building pads and allowed them to start placing compacted fill. I spent
the rest of the day on site as the contractor added water and processed the
soil. The contractor had placed and compacted the first foot of fill and was
ready for a test at 2:30 p.m. I took twelve density test on the building pads.
All of the test met the minimum 95% compaction. When I was finished with the
tests, I made plans to come back tomorrow to test the next foot of fill.